Project TypeProject Name ▲DescriptionStatus
Leisure Services (GO Bond) 12th Street Park This project converted a grassy right-of-way space into a small neighborhood park. The work included the addition of a small patio, site furnishings, sidewalks, lighting, enhanced landscaping and irrigation.Completed
Public Works 25.5 Wetlands Remediation This project includes the design, construction, and inspection for the removal of exotic and invasive plant material and subsequent replanting of approximately 16 acres of previously constructed wetlands on the "25.5" acre City owned parcel. In Progress - Design
Utilities 30" Water Main Replacement Along NW 44th St and N Pine Island Rd Replacement of the 42” diameter PCCP transmission main from the Springtree Water Treatment Plant to Pine Island Rd along NW 44th St, and the 30” welded steel transmission piping along Pine Island Rd, from south of the C‐13 canal to Oakland Park Blvd.In Progress - Construction
Leisure Services (GO Bond) 9525 Parcel Improvements This project will develop the existing vacant City parcel at the northeast corner of W Oakland Park Blvd and NW 95th Ter into a new park. Security improvements will be included and costs will be determined during design.Proposed Project
Leisure Services (GO Bond) Bair Middle School Joint Use Park This project will enhance existing facilities at Bair Middle School under a joint agreement with the School Board of Broward County and the City. Security improvements will be included and costs will be determined during design.Proposed Project
Utilities Botaniko New Home Development Gas System This project is to serve a new 125 single family home sub-division to be constructed on the old West Course of the Bonaventure Country Club.In Progress - Design
Leisure Services (GO Bond) City Park Improvements This project is a complete renovation of City Park, including a multipurpose field, stage, 3-covered basketball courts, playground, splash pad and restrooms. Tennis courts to be refurbished. Security improvements will be included. In Progress - Design
Facilities City Post Office Building This project would allow for the conversion of the old Village Post Office building to a public use facility. The work includes bringing the facility up to current building codes. The final use of the building is yet to be determined.Proposed Project
Leisure Services (GO Bond) Civic Center Expansion This project allows for the expansion of the existing Civic Center to provide space for including a new gymnasium, enlarged fitness area and additional programming. Security improvements will be included and costs will be determined during design.In Progress - Construction
Public Works Commercial Blvd Landscape and Irrigation Impovements This project will enhance approximatley 1.5 miles of medians on W Commercial Boulevard from N Pine Island Road to the Sawgrass Expwy with new landscaping material and irrigation. Proposed Project
Utilities East Sunrise Water Main Replacement This project replaces the older AC and cast iron portions, and interconnects in a section of East Sunrise with PVC systems, relocating all piping within the public right-of-way. (bounded by NW 19th Pl, NW 58th Ter, NW 63rd Ave, and Sunrise Blvd)In Progress - Construction
Utilities Escape and Valencia Water Main Replacement This project includes the replacement of water distribution mains in Davie. The project is intended to improve integrity of the existing infrastructure and to provide additional system capacity.In Progress - Construction
Leisure Services Family Aquatic Center Expansion This project allows for construction of a new family aquatic center the will include a water playground adjacent to the 50 meter pool. Amenities will include slides, a river ride, and concession facilities Proposed Project
Leisure Services Flamingo Park Renovation This project will renovate and add amenities to the existing park including security improvements.In Progress - Construction
Stormwater Hiatus Road Drainage Relocation Per the Interlocal Agreement between the City and Broward County, the City has entered into a JPA with the County to relocate City drainage facilities which are in conflict with the proposed privacy wall and the new roadway construction.In Progress - Construction